Description | for removing galleries, pulpit, seats in the Nave and North and South aisles and transepts; to take up the stone flagging in the Nave, transepts and aisles, and repave, to reseat the church; to take down the Organ in the West gallery and refix it in two parts; to form an organ chamber; to provide new entrance screen at the Western end of the church and new gas fittings in Nave, aisles and transepts; to remove various monumental tablets and re-erect them; and to fill the lower parts of the windows in Nave and transepts up to the first transom. 28 Jan. 1896. With copy of same, and a draft petition 1895, 1896 Faculty for alterations in the church 1892 N.B. A note states that this was withdrawn in favour of a fresh one presented in 1895 Copy of resolution of the vestry adopting the Report of the Restoration Committee 14th March 1892 Correspondence concerning the faculty 1894, 1895 |