Description | Includes the following: Edward Lloyd Limited [Sittingbourne] - turbine room and boiler house (exterior), progress in the nine months construction of the station, turbine room (interior), boiler house (internal), fans and ash chutes (internal), coal handling skip;
City of Athens - the power station (external), turbine room (internal), house auxiliary geared turbine set (interior), a sub station (external), switch house (external), control room (interior);
Peterborough Corporation - the new power station (external), 12500 kW two-cylinder turbine set (interior), boiler house (interior), drier house (external), pulverized coal plant (interior), coal conveying plant (exterior), coal conveying tippler (external), HT switchgear (interior), control room (interior), circulating pumps (interior), circulating pump motors;
Hungarian Government, Budapest - erecting the power station (external), one of three 23000 kW turbines at the works (interior), turbine lowe pressure body (interior), blading turbine high pressure shaft (interior), blading turbine low pressure shaft (interior);
Preston Corporation - boiler house and power station (exterior); turbine room (internal), circulating water pump motors (internal), extraction pump drives (internal), condensing plant (internal), condensing plant extensions (internal), narrow gauge electric locomotive (exterior);
Blackburn Corporation - boiler house with generating station and coal handling plant (exterior), switch room (interior), coal handling skip (exterior);
Leicester Corporation - the power station (exterior), 25000 kW two-cylinder turbo-alternator set (interior), water screening plant (exterior), switch house (exterior);
The North American Metropolitan Power Station Co. Ltd, Brimsdown Station - two-speed circulating pump motors (interior);
Sudan Light & Power Company, Khartoum Power Station - 1125 bhp Fullager oil engine set (with 750 bhp set behind) (interior), water works (two exterior views). |